kcm | MEDIA
1815
paged,page-template,page-template-blog-large-image,page-template-blog-large-image-php,page,page-id-1815,paged-3,page-paged-3,ajax_fade,page_not_loaded,,qode-theme-ver-7.4,wpb-js-composer js-comp-ver-5.0.1,vc_responsive
 

MEDIA

10 Mar SYCUAN GOVERNMENT CENTER TIME LAPSE VIDEO

Included as an element of the project control and documentation program developed by KCM Group, the time lapse video provides a fascinating look at the project from the start of construction to the present. http://www.kcmgroup.net/videos/SGC-Time-Lapse-Construction-of-TAO-2-29-12-Reduced.mp4 http://www.kcmgroup.net/videos/SGC-Time-Lapse-5-22-12.mp4...

Read More

10 Mar SYCUAN CASINO REIMAGINED

Anna G. Larson — NOVEMBER, 2011 — Sycuan Casino’s renovation can be summed up in two words — exposed and holistic. The $27 million, 245,000 square-foot revamp designed by Hnedak Bobo Group (HBG) and Cleo Design focused on improving the flow of the space. “Our casino has historically suffered from the ‘repetitive addition syndrome’ that has ultimately resulted in the casino feeling very piecemeal and closed off from one area to the next,” said Sheila Howe,...

Read More

10 Feb CANYON HILLS DEVELOPMENT TIME LAPSE VIDEO

As an important tool in the management and environmental compliance controls, KCM Group monitored the project with a time-lapse video showing construction progress but also the associated environmental compliance practices in place through the course of the grading operations.   http://www.kcmgroup.net/videos/canyon_hills.mp4...

Read More

10 Jul GORDON KOVTON IS NAMED ONE OF SAN DIEGO MAGAZINE’S 50 PEOPLE TO WATCH IN 2013

Urban Planning GORDON KOVTUN The Team Leader Like it or not, the Plaza de Panama project moves forward towards breaking ground in 2013, and Kovtun will be leading the charge. He founded KCM Group in 2000 to lead the Irwin Jacobs-funded plan through design and approval. Now he’s focused on wrangling consultants and legal battles to get shovels in the ground....

Read More